03

PHASES of DEVELOPMENT

PHASE 1

Lab Phase:

TEM 

 

Chlamydomonas reinhardii

Lipid

A

A

PHASE 2

Truck or Facility

  • Recombinant DNA

  • Controlled environment

A

B

Pilot Study in Oil Field or Facility

"Closed System"

Open Pond in Thailand

Production Phase

CLEAN WATER TECHNOLOGY

ISSUES BEING ADDRESS

Rising Cost of Water in Drilling

Rising Cost of Transport/Export Water

Difficulty in Water Access

Depletion of Fresh water

High Amount of water use in Fracking Fluids

    (30K-60k barrels per well)

No one else is doing the closed system

Technology test for Biodiesel production

Portable Clean water for Future

Expansion to Industries such as Mining

PORTABLE CLOSED SYSTEMS

© 2020 Cabral Technologies

  • Twitter
  • LinkedIn